ProductSolutionsTradesPricingArticlesContact Log in Start free trial

For stucco, EIFS & plaster subcontractors

Stucco and EIFS contractor software for the trade the schedule ignores.

Your work is a stack of coats that each have to cure before the next one goes on, applied to the outside of a building, in weather you do not control, by a crew that cannot start until a tender has mix moving. Few trades on the job have a schedule written so directly by a material. And when the building leaks in year three, the water appears on your surface — never on the flashing somebody else installed and you covered up on day two. SubMark puts the barrier photographs, the weather days, the cure days and the elevation you actually finished on the record as they happen. One system, office to field — and the field is free.

Start free trial

14-day free trial, no card needed. Sign up from here and stucco & EIFS is already selected when you pick your trade. See pricing →

  • Each coat and elevation billable on its own line
  • The barrier and flashing photographed before lath covers them
  • Weather and cure days recorded the day they happen

What actually goes wrong on a stucco, EIFS or plaster job.

Your schedule is written by cure time, and the GC schedules you like a painter.

Three-coat work is scratch, then brown, then finish, and the spec and the standard it cites set how long each coat has to wait or cure before the next one goes on. That wait is a material property, not a production choice — you cannot add men to make cement hydrate faster. The pack has you confirm curing conditions with the GC before you mobilize for exactly this reason. What makes it survivable is a dated record of when each elevation got each coat, because a compression argument made from eight weeks of logs is a different conversation from one made from memory.

You bury the evidence on day two and get blamed in year three.

Sheathing, weather-resistive barrier, flashing, weep screed — the pack asks where your scope stops on all of it, because the answer is almost never written down and the consequences last a decade. You lath over that assembly and from that moment it is invisible. When water shows up on an interior finish three years later, it shows up on ‘your’ wall, and the first theory is always the stucco. The only defense is a photograph of each elevation’s barrier and flashing, dated, taken before you covered it.

The joints are somebody else’s detail and they crack on your surface.

Control and expansion joints are the third thing the pack has you settle with the GC, and the reason is that the layout is an architectural detail that is frequently thin, late or absent from the elevations. Put the joints where the drawings imply and a crack still reads as a stucco failure to everybody who looks at it. Get the layout confirmed in writing before the first lath goes up, and raise a change event the day a revised elevation lands, because a joint added after brown coat is cutting and rework, not a revision.

Scaffold is a second business running inside your business.

Swing stage, mast climber or frame — somebody furnishes it, somebody moves it, and your production rate is whatever access allows. If the GC’s schedule sends you back to an elevation you have already dropped, the remobilization is pure loss unless it was priced or raised as a change. Carrying access as its own budget line and its own schedule-of-values line is the difference between knowing that and finding out at closeout.

The mock-up is the real contract, and it gets approved late.

The approved assembly, finish and mock-up requirements are the first thing the pack asks about. Color, texture and aggregate on an approved panel become the standard every square foot of the building gets judged against — and production cannot start until it is signed off. When the architect sits on it for three weeks, those are your three weeks, not theirs, and the only version of that story that gets paid is the one with dates on it.

You are the last coat on the building, so everyone’s damage is your callback.

After finish coat the building keeps being built. Scaffold comes down, landscapers dig at the base, a hoist gets removed, another trade leans dunnage against an elevation. Every mark lands on the newest, softest surface on the job and comes back to you as punch. Priced as punch, that work is free. Logged the day it is found, with a photograph and a T&M tag signed on the spot, it is billable repair work done for somebody else’s crew.

Before you mobilize

The 4 things stucco & EIFS subs settle with the GC before mobilizing.

What is approved, where your scope stops, what has to be true before you start, and how you get at the work. Every one of them turns into a change order three weeks in if nobody writes the answer down — and the answer is worth nothing if it only lives in one PM’s inbox.

In the pack

Switch on Pre-Construction Review and these 4 questions are already the list, worded the way stucco & EIFS subs ask them.

  • Confirm the approved assembly, finish and mock-up requirements
  • Confirm where our scope stops on sheathing, weather barrier and flashing
  • Confirm the control- and expansion-joint layout with the GC
  • Confirm scaffolding, weather limits and curing conditions

Tick them off job by job, with your own note on each. The note is your answer — the pack ships the question and leaves the answer to you.

Pre-Construction Review is an opt-in module — it is not one of the eight switched on at setup. Turn it on in Settings and the list is already there in stucco & EIFS terms, with no upgrade and no setup call. Edit it once and it applies to every job; the tick and the note stay with the job it was asked on. See every module →

The stucco and EIFS job, mock-up to finish coat.

Your job is the same small sequence repeated elevation by elevation, with a cure between every step. This is how the work runs and what carries each stage in SubMark; the pack’s own phase list is below.

  1. 01 Bid & takeoff by elevation

    Square feet by assembly and finish off the elevations and wall sections, the linear feet of joints, trim, reveals and weep screed, and the access each elevation needs — each at its own rate.

    Bid Board, Plans & Drawings with deep zoom, Takeoff, Estimating & Proposals

  2. 02 Mock-up & submittals

    Product data, the approved assembly, and the color, texture and aggregate panel the whole building will be judged against. Production waits on the signature.

    Submittals with a material library, cover sheets and merged PDF export, Daily Labor Logs as the dated record of when the panel was built and when it was approved

  3. 03 Scope boundaries & joint layout

    Written answers to the three questions that decide the job: where your scope stops on sheathing, barrier and flashing; the control- and expansion-joint layout; and the weather and curing conditions you are being held to.

    Pre-Construction Review — a switch in Settings, carrying the pack’s own four items

  4. 04 Access & mobilization

    Swing stage, mast climber or frame scaffold, and the order the GC will release elevations in — which is rarely the order you would pick.

    Crew Scheduling across jobs, Where Workers Are, Purchase Orders for rented access pushed to QuickBooks

  5. 05 Prep & flashing

    Barrier, flashing, weep screed, casing bead and accessories — the assembly that stops being visible the moment lath goes over it.

    Daily Labor Logs with photos, filed under the job and the date, as the only record of what was behind the wall

  6. 06 Lath

    Lath, fasteners and accessories, elevation by elevation, with an inspection in many jurisdictions before any cement goes on.

    Daily Labor Logs with each work area and its phase, Schedule of Values & Draw Log with lath on its own line

  7. 07 Scratch & brown coat

    Two cement coats with a cure between them, a tender keeping mix moving, and a surface that has to be flat and true before anybody looks at color.

    Time Clock & Labor Logs feeding Job Costing, Daily Labor Logs recording the cure days nobody else counts

  8. 08 Insulation board & base / mesh

    On EIFS, EPS board and the base-coat-and-mesh layer that does the job the brown coat does in hard-coat — a different assembly, a different rate, often on the same building.

    Purchase Orders per delivery, Job Costing for materials committed against materials invoiced

  9. 09 Finish coat

    The coat everyone sees, matched to the approved panel, applied in the weather window the spec allows and ruined by rain, wind or a cold night.

    Daily Labor Logs with weather and a delay cause from a fixed list, Change Events when the window was taken away from you

  10. 10 Punch, damage & closeout

    Patching, color matching into a cured wall, other trades’ damage, then the closeout documents, the final draw and the retainage.

    T&M Tags priced off your rate lists and e-signed on site, Lien Waiver Tracking, Schedule of Values & Draw Log for the final draws

Every module named above ships today; the eight below are on from day one, and the rest are a switch in Settings, not an upgrade. The full list is on the product page.

In the pack

These 8 phases load with the EIFS / Stucco / Plaster pack the moment you pick it at setup.

They are the phase list your foremen pick from on every daily log, so the hours come back tagged to the part of the job they were spent on.

  1. 01 Prep / Flashing
  2. 02 Lath
  3. 03 Scratch Coat
  4. 04 Brown Coat
  5. 05 Insulation Board (EIFS)
  6. 06 Base / Mesh
  7. 07 Finish Coat
  8. 08 Punch

Rename, reorder or delete any of them in Settings — the pack is a starting point, not a cage.

A stucco schedule of values with each coat and the access on their own lines.

The pack opens the builder at material 30%, lath and base 35%, finish 25% and punch 10%. That lath-and-base line is doing the most work and hiding the most: it is two cement coats with a cure between them, or board and base and mesh, applied elevation by elevation over weeks. Split it so you can bill what you have actually finished. These are the kinds of lines a commercial stucco or EIFS schedule of values usually needs:

In the pack

Open the SOV builder on a new job and these 4 lines are already in it.

  • Material 30%
  • Lath / Base 35%
  • Finish 25%
  • Punch 10%
Of contract value 100%

What most commercial stucco & EIFS subs add

  • 01 Submittals, product data & approvals earned before any material ships
  • 02 Mock-up panel built and paid for long before production starts
  • 03 Scaffold, swing stage & access its own line, or remobilization is free
  • 04 Material — lath, accessories & trim stored-material line
  • 05 Material — EPS board, base, mesh & finish stored-material line
  • 06 Barrier, flashing & weep screed only as far as the boundary you agreed in writing
  • 07 Lath & accessories — installed
  • 08 Scratch coat
  • 09 Brown coat separate from scratch, or you bill one coat for two
  • 10 Insulation board & base / mesh (EIFS) a different assembly from hard-coat
  • 11 Finish coat
  • 12 Control & expansion joints, reveals & trim where added joints get billed
  • 13 Sealant at joints & penetrations a line only if the answer was yes
  • 14 Patching, color matching & punch
  • 15 Closeout documents & warranty

Three things worth arguing for before the contract is signed. Split scratch, brown and finish into separate lines, because a single lath-and-base line at 35% means an elevation with two of three coats on it bills as a guess, and on a long job those guesses are what a GC’s project manager reaches for when he wants to hold money. Put the mock-up and the scaffold on their own lines: both are real cost spent before and between the coats that earn, and bundled into the install lines they are invisible until the job is over. And carry patching and color matching separately from punch — matching a finish into a cured wall is skilled work on somebody else’s damage, and a contract that calls it punch is a contract that calls it free.

That longer list is an illustration, not a template — your SOV is negotiated with your GC. SubMark gives you the SOV to build, and tracks every draw, retainage amount and payment against it. It is your record of the job, not a replacement for the GC’s billing system — you submit the draw the way each GC requires and log it here.

Inside SubMark

One calendar for every crew on every job.

A lath crew on one elevation, a brown-coat crew on another that cured over the weekend, and two mechanics patching a finished wall at a third job while the scaffold is still up. SubMark schedules every worker in one calendar and flags the double-booking before a crew is on the wrong site.

A week of crew scheduling in SubMark, with one worker flagged for a double-booking on Wednesday, a '1 conflict' warning in the toolbar, and per-day worker capacity bars underneath

On from day one, in every trade’s setup.

Nothing is paywalled by tier. These eight are switched on in every one of the 29 trade packs, stucco & EIFS included, from the moment you finish setup.

T&M Tags

Field tickets priced off your own rate lists and signed by the GC on the spot.

Change Events

The field logs a scope change with photos the day it happens, then it converts to a CO.

Draw Calendar

Every GC’s billing cutoff and submission method in one calendar, with reminders.

Submittals

Submittal packages with a material library, cover sheets and merged PDF export.

Daily Labor Logs

Weather, narrative, labor, materials and photos, with a submit-and-review workflow.

Timesheets

Weekly rollups with worker signatures and supervisor approval, plus a payroll summary export.

Where Workers Are

A live view of which workers are on which job today.

Safety

Toolbox talks, inspections, incidents, and certification and COI tracking with expiry dates.

Pick EIFS / Stucco / Plaster at setup and SubMark loads the pack: the phase list your foremen pick from — Prep / Flashing, Lath, Scratch Coat, Brown Coat, Insulation Board (EIFS), Base / Mesh, Finish Coat and Punch, which is the coat sequence itself, with a wait between the steps; work types for lath, scratch, brown, insulation board, base coat and finish; worker types for Foreman, Plasterer, Mechanic and Tender — a tender on the list, because your production is gated by whoever keeps mix moving; a material list built around lath, EPS board, base coat, mesh, finish coat, stucco mix, weep screed and sealant; project statuses that run Pre-Construction, Lath, Base Coat, Finish, Complete; project types for office TI, retail, healthcare, industrial and hospitality, because this pack opens on commercial rather than residential; and a schedule-of-values breakdown weighted material, lath and base, finish and punch. The pack also writes four pre-construction review items in your trade’s terms: the approved assembly, finish and mock-up requirements; where your scope stops on sheathing, weather barrier and flashing; the control- and expansion-joint layout; and the scaffolding, weather limits and curing conditions — waiting for the day you switch that module on, because the pre-construction review is one of the switches in Settings rather than one of the eight that are on from day one. Elevation is the word this pack uses for a unit of work, and once you switch Elevation Tracking on in Settings it becomes one. Anything the pack gets wrong, you change in Settings.

The worker types are already there too — Foreman, Plasterer, Mechanic and Tender — on every worker record and on every daily labor log. The only thing left to enter is your own rates.

Questions

EIFS / Stucco / Plaster subcontractors ask us these.

How do we prove what was behind the wall before we lathed over it?

With a daily log made on the day each elevation was prepped, carrying photos of the barrier, the flashing, the weep screed and the accessories, filed under the job and the date. Uploads are images only — no PDFs, no video — which suits this job, because what you need in three years is photographs. The habit that pays is one log per elevation per prep day, so a question about the northeast elevation in 2029 is a date lookup rather than a search through a shared drive nobody maintained. SubMark holds the record; it does not certify the work.

Can we show that cure time and weather, not our crew, set the schedule?

Yes, and for your trade it is the most valuable habit there is. Each day’s log records weather, the areas worked, hours per worker and a delay with its cause from a fixed list — weather, material, labor, access, GC direction, inspection or other. Days when nothing could be applied because an elevation was curing, or because it never got above the spec’s minimum overnight, are logged as exactly that, on the day. Eight weeks of those is a dated account of a sequence a material wrote. It will not move the GC’s date; it is what makes the compression conversation something other than two people remembering differently.

Can we bill an elevation that has scratch and brown on it but no finish?

Only if the schedule of values has the lines. That is why the first thing to do with the pack’s 35% lath-and-base line is split it — lath, scratch, brown, and base and mesh for the EIFS assemblies — so a wall that is two coats in bills as two coats rather than as a percentage somebody has to accept. SubMark holds the schedule of values and logs each draw you submitted against it, with what was certified, what retainage is held and when the money landed. It does not negotiate the breakdown for you, and the schedule of values locks when the first draw is submitted, so the structure has to be right before that.

Who owns the weather barrier and the flashing?

SubMark cannot settle that, and software that claims it can is selling something. What it does is make sure you ask before you mobilize: switch on Pre-Construction Review and the pack’s second item — where your scope stops on sheathing, weather barrier and flashing — is already on the list for every job, with somewhere to write the answer. The list is tenant-wide, so you edit it once and it applies to every project, while the tick and the note stay with the job. Two minutes, on the scope question that outlives the warranty.

The architect added control joints after we started. How does that get paid?

As a change event on the day the revised elevation lands, with the elevations and the linear feet affected, then a priced change request or a T&M tag depending on how the GC wants it handled. Joints added after brown coat are cutting and rework, not a revision, and the distinction has to be on the record early. Several T&M tags can convert into one change order, so a building’s worth of added joints does not become a building’s worth of separate arguments. Approved change orders are added to the schedule of values automatically.

Can we see labor by coat — how much went into scratch versus finish?

Not as a cost split by default, and it is worth being straight about. The daily log records hours per worker, and each work area on it carries its phase and percent complete, so you can see where lath, scratch, brown and finish stood on any day. Job costing is per job, grouped by cost type — labor, crew lump sum, materials invoiced, materials committed, QuickBooks costs and subcontractors — against your budget lines. Switch Elevation Tracking on in Settings and elevation becomes the unit of work, which for this trade is the more useful cut anyway: the elevation that went badly is the one you want to find, and labor rolls up by elevation. It is not on by default.

How do we stop other trades’ damage becoming our punch list?

By pricing it as repair the day it is found rather than absorbing it as punch. The log entry with the photograph establishes that an elevation was complete and undamaged, so the mark that appeared after the scaffold came down is somebody else’s. From there it is a T&M tag priced off your own rate list and e-signed on site by whoever authorizes it. Patching and color matching into a cured wall also belongs on its own schedule-of-values line, separate from punch — the work is skilled and the contract should not call it incidental.

Do we have to stop using the GC’s billing portal?

No. Keep submitting through whatever portal, template or email each GC requires. SubMark is where the schedule of values lives — each coat split out, the mock-up and the scaffold on their own lines, patching separated from punch — and where every draw you submit is logged against it. Procore, Textura and GCPay are recorded as the submission method on a job; nothing is sent on your behalf. SubMark is not a document generator.

Does it connect to QuickBooks?

Yes. Connect QuickBooks Online once and bills and purchases pull into job costing — hourly, if you switch auto-pull on — so a pallet of finish coat sits against the job it was delivered to. Draws go across as QuickBooks invoices and POs as purchase orders, one at a time with a click. For your trade the habit worth keeping is a PO per delivery and one for the rented access, so committed cost shows against the budget before the supplier or the scaffold company invoices you. A coverage meter shows how much of the cost pulled from QuickBooks is coded to a job at all; it is company-wide rather than per job.

Do my field crews cost extra?

No. Field users are free and unlimited, and so are the subs you invite into a job. You pay one company subscription: $249 a month with your first 3 office users included, then $39 a month each. The whole breakdown is on the pricing page.

See it on a stucco & EIFS job.

Start the trial, confirm stucco & EIFS on the first screen, and the pack loads your phases, checklists and worker types in your own words. Or take a 30-minute walkthrough with the person who built it, on your kind of jobs, instead of a canned demo script.

Start free trial

14-day free trial, no card needed. See the whole product →

$249/mo for your company, your first 3 office users included, $39/mo each after that. Field crews are free and unlimited. See what's included →

Other trades

Electrical

Gear you pay for months before you bill it, rough-in hours that disappear, and every tenant change landing on your scope.

HVAC / Mechanical

Equipment bought a year before it is billed, shop fab the GC will not pay for, and a closeout that holds your last 10% for six months.

Plumbing

First in the ground and last out of the building — with a quarter of the contract value stuck behind the finish trades.

Drywall & Framing

A third to half the contract spent on board before anything is hung, five finish passes nobody can measure, and three punch walks and a clean-up that are all on you.

Concrete

Pour days that cannot move, ready-mix invoices you reconcile weeks later, and forms that are capital cycling across placements.

Fire Sprinkler

Weeks of hydraulic engineering before you can bill a dollar, and every phase gated behind an inspection you do not schedule.

Glazing & Glass

Custom material you cannot order until you field measure, cannot return once you do, and cannot bill until a water test passes.

Roofing

A tear-off that owns the building until dry-in, rotten deck nobody bid, and a warranty package standing between you and retainage.

Low voltage

Drop counts that move with every furniture plan, cable sitting in a locked IDF for months, and a final 10% that waits on a test report.

Fire alarm

A quarter of the contract behind an acceptance test you do not schedule, retests you never bill, and device counts that move all year.

Painting

The last trade on the schedule, four return trips for other people’s damage, and prep bid against a wall nobody left you.

Flooring

A slab that fails its moisture test, prep bid against a flatness spec nobody hit, and a whole building’s material stored for months.

Masonry

Scaffold that is capital, grout lifts gated by an inspector, and a mock-up panel holding up the whole brick order.

Structural & Misc Steel

Two thirds of the contract is detailing, mill material and shop work, earned before a single piece is erected, and the last five percent is a handrail holding your retainage.

Wood Framing

Fourteen buildings billed as one percentage, a lumber package that is 40% of the contract before a wall goes up, and blocking you owe six other trades that nobody drew.

Excavation & Sitework

The only schedule of values on this site that opens without a single line for product you buy: your contract is production, billed against quantities somebody else surveyed.

Waterproofing

Work that is buried within a week of going in, blamed for every drop of water for the next ten years, and finished with sealants months after everyone forgot you were on the job.

Doors, Frames & Hardware

Half the contract is product you buy months early, and the last three openings out of four hundred hold your punch, your final draw and your retainage.

Demolition

A scope nobody can see until you open the wall, extra work that leaves in the dumpster before anyone prices it, and retainage held for a year after you demobilized.

Insulation

A four-day window between rough-in inspection and board that nobody protects, half the contract sitting in material you staged weeks early, and firestopping everyone assumed was yours.

Acoustical Ceilings (ACT)

Grid that cannot start until every trade above the ceiling is finished, tile that drops in the last three weeks of a two-year job, and a finished ceiling the whole building then uses as an access hatch.

Paving & Asphalt

Material with a clock on it and a crew on the clock whether you place or not, a subgrade somebody else owns, and six months of construction traffic on the binder course you have to warrant.

Tile & Stone

A finished floor installed on somebody else’s slab, to a flatness tolerance the concrete sub was never asked to hit, with waterproofing and movement joints that belong to nobody until the warranty call comes.

Millwork & Casework

Half your contract earned in your own shop before anything reaches the site, built to a drawing of walls somebody else framed, with the furnish-and-install line drawn in a meeting you were not in.

All trades

SubMark ships a setup pack for 29 commercial trades. See the full list.