How the money actually moves on a subcontract.
Guides for the people who run billing, change orders and job costs at a commercial specialty subcontractor. Written for your side of the contract, not the GC's.
-
Change orders & extras
Change order markup: the percentage is in your contract, not on the internet
Not 10 and 5 because the internet says so. Where your cap really comes from, the markup-versus-margin math subs get backwards, and what markup never pays.
8 min read -
Field & cost
Bid day: four of your six suppliers never sent a number
Your bid is due Thursday and two of six suppliers have answered. Why quotes do not come back, and how to run an invitation that gets you covered numbers.
9 min read -
Field & cost
Inspection holds and retests: the gate between your work and your money
An inspection you did not schedule, could not attend, and get billed for twice. How to track inspection dates, re-inspection fees and who owes the retest.
10 min read -
Field & cost
The job start-up checklist: what to settle before the first crew shows up
The two start-up lists a commercial sub needs: four questions to settle with the GC before mobilizing, and the internal tasks that belong in week one.
9 min read -
Field & cost
Units per hour: the labor number your cost report cannot give you
How a commercial sub tracks labor productivity while the job is still running: picking the unit, deciding which hours count, and reading the ratio weekly.
10 min read -
Billing & draws
Billing stored materials: how to get paid for gear that is on site and not installed
Switchgear lands in March and gets installed in July. Stop floating it: the SOV line, the support package, the drawdown, and the deadline you cannot miss.
8 min read -
Field & cost
Warranty callbacks: the call fourteen months after you demobilized
Punch is contract work. A warranty callback is not. The three buckets a callback falls into, and the old record that decides which one pays for it.
11 min read -
Change orders & extras
Weather days: the allowance in your contract, and the cost nobody bid
Weather is not an excuse on your job, it is a cost. The weather-day allowance in your subcontract, time versus money, and winter conditions as a change.
11 min read -
Field & cost
What your field buys at the counter, and when you find out
A will-call ticket is a real cost with no order behind it. How to control counter buying, and the exact chain that gets the charge onto the right job.
9 min read -
Field & cost
The cost code list nobody decided, and how to build one for your trade
Where a sub’s cost code list should come from, how many codes to run, the five kinds every list needs, and how they line up against the SOV you bill.
9 min read -
Field & cost
How to document a construction delay when you are the subcontractor
The GC schedule slipped and your crew ate it. Here is the contemporaneous record that makes idle time, stacked trades and extended duration recoverable.
9 min read -
Field & cost
Long-lead material: the order date is set by the approval, not by the install date
Long-lead items are not late because somebody forgot to order them. They are late because the submittal sat. How to work backwards and hold the dates.
9 min read -
Change orders & extras
Material price increases: when you can bill them, and when you just ate them
Copper just went up 19% and your quote expired in February. The four grounds that actually work, and the six-part request a GC will read instead of file.
8 min read -
Field & cost
The punch list process for subcontractors: one list, four buckets, three statuses
A GC punch list arrives as one document. The sub-side process: one receiver, four buckets, three statuses, and a re-walk you have to ask for.
10 min read -
Change orders & extras
Remobilization: the trip you claim, and the trip you eat
Your contract pays to mobilize once; the GC releases work in half-areas. What a return trip costs, which trips you can claim, and the term to settle.
11 min read -
Billing & draws
One contract, fourteen buildings: which axis your schedule of values should follow
A phased job bills off one schedule of values. How to pick the axis — building, floor, phase or area — before your first SubMark pay app locks it.
10 min read -
Change orders & extras
The subcontract scope review: what to settle before you sign
The operational read of a subcontract before you sign: what really defines your scope, whether your exclusions survived, and nine facts to write down.
9 min read -
Field & cost
Tracking COI expiration for the subs you hire
A certificate of insurance is a snapshot with a date on it. What “current” has to mean, and why the reminder should go to your sub and not to you.
9 min read -
Field & cost
The subcontractor prequalification packet: what GCs ask for, and how to answer it once
Every GC asks the same facts in a different form. What a prequal packet contains, what quietly gets a sub declined, and the file that answers all of them.
10 min read -
Billing & draws
The subcontractor WIP report: how over- and underbilling is actually calculated
Your surety and your banker want the WIP schedule. The four inputs, the arithmetic worked line by line, and why underbilled is the column to fix first.
9 min read -
Field & cost
The submittal log is a schedule document, not a filing cabinet
Approval holds your order, and the person holding it has no stake in your shop calendar. What to record so the delay is a dated fact, not a memory.
10 min read -
Field & cost
Truck tickets: four numbers for the same dirt, and only one of them pays you
Loads, in-place yards, truck measure and scale tickets are four numbers for one quantity. How to count what left the site and reconcile it before closeout.
9 min read -
Field & cost
The two-week look-ahead, translated into names and hours
The GC’s two-week look-ahead is not your crew plan. How a commercial sub turns bars and durations into quantities, hours, crew size and named people.
8 min read -
Field & cost
The supplier invoice that does not match the purchase order
The supplier bill is for a quantity you never ordered at a price that is not on the quote. The approval routine a six-person office can actually run.
10 min read -
Change orders & extras
Change event vs. change order: two records, two owners, two clocks
One is your record, the other is their signature. Confuse the two and extra work you already performed quietly stops being billable. Here is the split.
7 min read -
Change orders & extras
Back charges in construction: how a sub stops paying for somebody else's mistake
A back charge arrives as a deduction on a draw you already submitted, months after the event. What makes one stick, what kills it, what to do day one.
9 min read -
Billing & draws
Every GC bills on a different calendar: how to run them all at once
Every GC bills on its own calendar, and one missed cutoff costs you 30 days of cash. The five dates to record per job, and how to back-plan billing week.
8 min read -
Billing & draws
How a subcontractor builds a cash flow forecast that is actually right
Your forecast fails because billed is not collectible. Build it from four facts you already have, in weekly buckets, with retainage on its own line.
9 min read -
Field & cost
Construction safety documentation: what a subcontractor actually has to keep, and who asks for it
Four audiences ask a sub for safety paperwork and each wants something different. What the prequal needs, what the site needs, and why expiry dates bite.
9 min read -
Field & cost
Choosing a construction time clock app as a commercial sub: the questions that actually matter
Most time clock apps prove attendance. A commercial sub needs hours that land on the right job at the right rate. Eleven questions to ask first.
9 min read -
Field & cost
Crew scheduling for commercial subcontractors: you schedule commitments, not appointments
A commercial sub has a commitment problem, not a dispatch problem. The four questions a crew schedule has to answer, and how double-booking happens.
8 min read -
Field & cost
A foreman daily log template that holds up nine months later
The eleven fields a sub's daily log needs, what makes an entry useless in a dispute, and a template a foreman can finish in two minutes in a truck.
8 min read -
Billing & draws
The GC is not paying you. What to do, in order.
A draw is late. Before you escalate, find out which of four places it is actually stuck — the answer changes who you call and what you ask for.
9 min read -
Field & cost
How to calculate your labor burden rate, and the divisor that ruins it
Labor burden is what an hour costs above the wage. The components, where each number comes from, the divisor most subs get wrong, and when to redo it.
9 min read -
Billing & draws
How to close out a commercial construction job when you are the sub
Closeout decides whether you collect the last five to ten percent of your contract. The sub-side sequence, starting before your crew demobilizes.
8 min read -
Field & cost
How to manage lower-tier subcontractors when you are the one hiring them
Buy lump-sum work and you are somebody else’s GC with none of a GC’s tools: scope gaps, two payment clocks, flow-down retainage, and COIs that lapse.
9 min read -
Billing & draws
Lien waiver tracking in Texas: the document that gives up rights, and the one that keeps them
Texas subs sign lien waivers monthly and, when a month goes unpaid, owe a statutory notice too. How to track both without losing a draw.
8 min read -
Billing & draws
Percent complete or unit price: the billing decision you only make once
How percent complete and unit price billing differ, which fits your trade, where the quantity risk sits, and the three ways subs choose badly.
8 min read -
Systems & software
Your GC uses Procore. Do you need your own system?
Honest answer for commercial subs: what the GC platform is good at, the four things it cannot do for you, and when a spreadsheet is still the right call.
9 min read -
Field & cost
The purchase order process for subcontractors: money spent before the invoice arrives
When a PO is worth writing, what belongs on it, and why open purchase orders are the reason a commercial job can look under budget and already be over.
8 min read -
Systems & software
QuickBooks job costing for subcontractors: what it does well, where it stops, and what to put in front of it
QuickBooks can cost a job. What it cannot hold is your schedule of values, pending change orders or committed costs. Where that line falls, and why.
9 min read -
Field & cost
A subcontractor PM's day: what the routine looks like when the office runs five jobs at once
An hour-by-hour day for a commercial sub's PM: the morning check, the GC calls, the paperwork nobody else does, and the twenty minutes that matter.
8 min read -
Field & cost
How to track labor hours by job and cost code without three sets of numbers
Why payroll hours and job-cost hours disagree, how to build a cost-code structure a foreman will use, and the five rules that make labor hours reconcile.
9 min read -
Billing & draws
When is retainage released on a commercial job?
Retainage is not released on a date — it is released when four gates clear. What controls the timing on commercial work, and how to chase an old balance.
8 min read -
Change orders & extras
How to bill for extra work without a signed change order
No signed change order for work your crew already did? What to put in writing today, why not to slip it onto the pay app, and how to get it approved.
7 min read -
Change orders & extras
The change order log a subcontractor actually needs
The eleven columns a sub's change order log needs, the two numbers it exists to produce, and the four ways a spreadsheet log still fails.
7 min read -
Change orders & extras
How to price a T&M ticket so the number survives review
What goes into a T&M ticket price: burdened labor by classification, overtime, material markup, equipment and standby, and the O&P your contract allows.
7 min read -
Change orders & extras
The subcontractor change order process, from the sub’s side of the table
The seven stages from the sub’s seat, who owes the next move at each one, and the four places subs lose money on work they have already finished.
8 min read -
Billing & draws
Schedule of values for subcontractors: how to build one that bills clean
How to build a schedule of values as a sub: breaking out line items, where retainage and change orders sit, and why week one decides every draw.
8 min read -
Change orders & extras
T&M tickets in commercial construction: getting signed, and getting paid
Four unbudgeted hours are only billable if the right things got written down before the crew left. What belongs on a tag, and how a stack becomes one CO.
6 min read